Projects

Use the menu to browse our portfolio of completed, current, and bidding projects.

Marion ISD – 2023 Bond Projects

Marion, TX
O’Connell Robertson

Security upgrades and renovation work includes upgrade to all building entries, renovations of vestibules and administration areas and exterior renovations to primary and elementary playgrounds. High school additions and renovations work includes, new competition gym and athletics, new performing arts, black box, and CTE additions that will connect existing high school to cafeteria. Renovations to existing cafeteria and entire high school interior for dedicated library and additional classroom space.

Navarro College – Albritton Building Renovations

Corsicana, TX
Harris Craig Architects

Grades 3-4. 750 student capacity. Ground-up two-story school with a gym that will also serve as a storm shelter. Common area has a children’s slide from second floor to first. Large media center, playground and game area and two parking lots with 289 spaces.

Mabank ISD – New Elementary School

Mabank, TX
Claycomb Architects

Grades 3-4. 750 student capacity. Ground-up two-story school with a gym that will also serve as a storm shelter. Common area has a children’s slide from second floor to first. Large media center, playground and game area and two parking lots with 289 spaces.

Mabank ISD – Junior High Additions & Renovations

Mabank, TX
Claycomb Architects

Six classroom additions (adding 150 student capacity) and restrooms. Repair campus drainage, expansion of cafeteria, courtyard addition, interior renovations.

Mabank ISD – High School CTE Addition

Mabank, TX
Claycomb Architects

Adding capacity for over 300 students; includes lab settings, classroom space, and storage to support a wide range of Career and Technical Education (CTE) programs including Auto Tech, Business & Finance, Construction, Culinary Arts, Education & Training, Engineering, Horticulture/Floral, Health Science, Information Technology, Law Enforcement, Marketing, Vet Tech, and Welding.

Lewisville ISD – Creek Valley Middle School 20-Year Refresh

Carrollton, TX
VLK Architects

This project includes the renovation and replacement of existing building components including new MEP, finishes, A/V equipment, technology and security equipment, casework, and exterior site improvements.

Lewisville ISD – Durham Middle School 20-Year Refresh

Lewisville, TX
VLK Architects

This project includes the renovation and replacement of existing building components including new MEP, finishes, A/V equipment, technology and security equipment, casework, and exterior site improvements, including a roof replacement component.

Carrollton-Farmers Branch ISD – Athletic Upgrades & Renovations

Carrollton, TX
Design Build with Paragon Sports Construction

Complete gut and refresh to the entirety of existing middle school. Includes bringing in (16) portable classrooms and associated utility connections. Multi-Phased interior renovations throughout the entire campus, including a front entry renovation, classroom renovations, installation of a pop-up skylight roof by removing existing concrete tee roof deck and adding structural steel, and replacing the entirety of the existing sanitary sewer line running underneath the structural slab on void.

Carrollton-Farmers Branch ISD – 2023 Bond Projects Package 1 & 2

Carrollton, TX
DLR Group

Package 1 – Renovations for Creekview High School include CTE Classrooms, dance floor remediation, and the SPED area. Renovations for Kent Elementary include food service equipment replacements, corridor finishes, Pre-K & SPED areas, gym & fine arts improvements. The scope of work for Rainwater Elementary includes playground replacement, SPED renovations, fine art improvements, and STEM renovations. Package 2 – The Davis Elementary project includes interior renovations to SPED, stage, art, and music areas. We are replacing the playground with new surfacing, equipment, and shades. We are re-roofing roughly 30% of the campus. The Thompson Elementary project also includes interior renovations to SPED and kindergarten classroom areas. We are re-roofing roughly 80% of the campus.

Burleson ISD – Mound Elementary School Gym Addition

Burleson, TX
Pfluger Architects

9,400 SF new gymnasium that will act as a storm shelter for the entire campus. The new gymnasium facade is ICF construction with a mixture of metal panels and brick.

Rice ISD – New Early Childhood Education Center

Rice, TX
Claycomb Architects

Newly renovated student locker room and training facility featuring updated locker rooms, training rooms approximately 4,714 square feet. New single story athletic facility including weight room and media room, approximately 8,338 SF.

Hughes Springs ISD – Field House Renovation

Hughes Springs, TX
Godwin Design Architects

Newly renovated student locker room and training facility featuring updated locker rooms, training rooms approximately 4,714 square feet. New single story athletic facility including weight room and media room, approximately 8,338 SF.

Pittsburg ISD – Junior High Additions & Renovations

Pittsburg, TX
BWA Architects

Projects include a new kitchen, cafeteria addition that doubles as storm shelter, fire alarm and fire sprinklers, classroom additions, and renovation of the existing kitchen to SPED classrooms.

Pittsburg ISD – New High School

Pittsburg, TX
BWA Architects

A new 3-story, 135, 000 SF high school with a new practice gym that doubles as storm shelter, cafeteria, science labs, culinary arts, theater and music classrooms, SPED area, computer labs. New parking lot, new football practice field, new bus drive connecting three schools.

Elysian Fields ISD – 2024 Bond Program

Elysian Fields, TX
Harris Craig Architects

New Elementary School (69,700 SF), HS locker room add/reno, demo and replace field house, relocate transportation building

Malakoff ISD – Lee Orr Gym Renovation

Malakoff, TX
Claycomb Architects

The Malakoff Orr Gym is a complete refresh of the existing gymnasium that has been in the district since the early 1950s. The complete gut and renovation includes new mechanical, electrical, new wood floor, bleachers, restrooms, and basketball goals. The exterior will receive a new walkway canopy cover, new kalwall windows, and painting of the exterior with graphics to bring curb appeal to the refinished space.

Winona ISD – Stadium Improvements

Winona, TX
Harris Craig Architects

New prefabricated press box and new stadium lighting.

CHRISTUS Health – Free Standing Emergency Department

Mount Pleasant, TX
Harris Craig Architects

Free Standing Emergency Department 15 exam rooms, CT, X-Ray, Lab, Physician sleep room & dressing room, 2 triage areas, ambulance corridor. Also included in this building is a provider clinic with provider offices and 36 exam rooms.

CHRISTUS Health – Free Standing Emergency Department

Palestine, TX
Harris Craig Architects

This nearly 20,000 square-foot facility will feature 10 in-patient beds and 15 emergency room beds.

Hays CISD – Bid Package 6

Kyle, TX
O’Connell Robertson

Hays CISD – Dahlstrom & Wallace MS

Kyle, Texas
O’Connell Robertson

Hays Dahlstrom & Wallace Middle School. Dahlstrom Middle School work includes replacement of 73 tons of HVAC split units, one boiler, new site drainage and loop install on north side of property, new canopy from building to new drive, new sidewalk and repairs/replacements of existing drives. Wallace Middle School work includes replacement of 31 tons RTU’s, 43 tons of HVAC split units, 16,150 cfm DOAS units, one boiler and 16,500 SF of modified bitumen roofing.

Chapel Hill ISD – New Operations Center

Tyler, Texas
Harris Craig Architects

The 14,370 SF Operations Center project will include workshops and warehousing as well as new wash bays & fuel stations for the existing Transportation Building at their Administration Complex.

Chapel Hill ISD – New Junior High

Tyler, Texas
Harris Craig Architects

The Junior High School is a new 136,000 SF one-story building. It will include new classrooms, fine arts, interior athletics, and outdoor athletics including new football field and track.

Texarkana ISD – Texas High School CTE Additions & Renovations

Texarkana, Texas
Corgan Architects

The 100,000 SF new building will house lab-based CTE programs such as Culinary Arts, Health Science, etc., and include a storm shelter. 30,000 SF of renovations will include classroom-based programs in the existing high school. This project will also include outdoor learning areas, fire lanes, parking, and landscaping.

Pewitt Consolidated ISD – New Elementary School

Omaha, Texas
Godwin Design Architects

Mount Vernon ISD – 2023 Bond Program

Mount Vernon, Texas
WRA Architects

This six-phase project encompasses 60,000 SF of new construction and 25,000 SF of renovations. Key elements include a new Fine Arts building and cafeteria at the High School, upgrades to the libraries at both the Junior High and High School, and the addition of a new administrative area at the Middle School.

Little Elm ISD – Lakewood Village Elementary

Lakewood Village, Texas
Corgan Architects

Little Elm ISD – Elementary #7. Set for completion next summer, this new 95,000 square foot, ground-up school will accommodate up to 750 students. The facility will feature a stage, cafeteria, library, and a gymnasium that doubles as a storm shelter. At the heart of the school, there will be a courtyard, and the second-floor wings E and F will include a dedicated STEM classroom along with small study group spaces.

Westwood ISD – Jr. High Additions/Renovations & Security Upgrades to surround campuses

Palestine, Texas
Pfluger Architects

The Jr. High currently has 4 individual buildings that kids must walk to between classes, but when JCC is done, it will be one building consisting of 102,000 SF. Westwood Jr. High will be getting major new components such as the Kitchen and Cafeteria, Locker rooms, Art and Media rooms, as well as the Band and Choir section. The building layout will give the school an enclosed 4,500 SF paved courtyard to enjoy on nice days. Each existing building will get new interior finishes and some floor design changes.